MECHANICAL UPGRADE – 15 STATE ST.
This contract consisted of the replacement of air conditioning equipment. This included the removal and replacement of one air handling unit and two (2) condensing units on the roof of the 11-story building. Another air handling unit at the bottom of the building’s air-shaft was removed and the roof replaced. The work within the building included the removal and reconfiguration of ductwork serving the first floor and mezzanine. New control dampers were installed at the connections to the supply riser on each floor. The full scope of work included mechanical, plumbing, electrical and associated work to provide a fully operational cooling system for the building.
VA PROVIDENCE DUCT & FIRE DAMPER
Numerous areas of the medical facility, (i.e., patient wards, psychiatric ward, surgery and many other areas of the facility) were included in this project. The scope included us to supply all labor, material, equipment and supervision to remove old fire dampers and replace with new; install access doors; remove abandoned ductwork and restore existing fire rated walls and floors. Work included fire alarm modifications; testing and programming; and the installation of three new pairs of fire
alarm activated cross-corridor fire doors. Incidental asbestos removal and stringent dust control was also required.
NPS SAND SLURRY PIPELINE/REROOFING
NPS SAND SLURRY PIPELINE/REROOFING This project required all materials, labor and supervision to construct a 3 1/2 mile 12" diameter pipeline for the purpose of controlling beach erosion. A new pre-engineered metal building (25X28) will be constructed on a reinforced concrete foundation and floor slab. In addition a 2nd project required all materials, labor and supervision to re-roof four (4) buildings in the Ft Hancock Historic District NPS Gateway Nat’l Recreation Area Sandy Hook Unit, NJ.
USCG HVAC & CONTROL-MULTIPLE SITES
This project required all labor, materials, equipment, transportation, supervision and disposal associated with the Design/Build for the replacement of the existing HVAC systems and all new controls located 3 different US Coast Guard sites; USCG Point Allerton, USCG Station Gloucester, & USCG Merrimack. At Point Allerton the existing boilers were left in place.
Miscellaneous metals & structural steelConstruction managementPre-constructionDesignSite selectionGreen (LEED) Building Servicesfacilities management